Bid Results

The bid results provided below are unofficial and may not represent the final bid tabulation.  Official bid tabulations must be requested from the project Owner.

Bid Date:  August 28, 2019

Bid Results 

 The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY 2019 T.I.A. Roadway Resurfacing & Widening as described in the Contract Documents and Specifications.  In general, construction consists of 7.35 miles of Full Depth Reclamation, 4.35 miles of roadway widening and resurfacing, striping and all associated measures for the complete project.  This work will be awarded in one (1) contract with a 180-consecutive calendar day construction schedule.

Bid Date:  September 10, 2019

Bid Results 

 The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY 2019 Street Resurfacing – Phase 7 as detailed in the Contract Documents.  In general, construction consists of +/- 8.0 miles of roadway resurfacing, including roadway striping, raising miscellaneous structures and all associated measures for the complete project.  This work will be awarded in one (1) contract with a 180 consecutive calendar day construction schedule.

Bid Date:  August 1, 2019

Bid Results 

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed project titled “FY 2019 LMIG for Roadway Resurfacing”. In general, construction consists of approximately 4 miles of full depth reclamation with Portland cement, asphalt paving and striping, various patching on 5.8 miles of roadway, and resurfacing on 0.36 miles of roadway including striping. This work will be awarded in one (1) contract with a construction timeline of 180 consecutive calendar days.

Bid Due Date: July 11, 2019

Bid Results

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY 2019 LMIG Safety Action Plan as described in the Contract Documents and Specifications. In general, construction consists of resurfacing and striping of approximately 4.5 miles of roadway and all associated measures for the complete project. This work will be awarded in one (1) contract with a 60-consecutive calendar day construction schedule.

Bid Due Date: June 20, 2019

Bid Results

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY 2019 OSS LMIG for Striping Improvements project as described in the Contract Documents and Specifications.  In general, construction consists of the striping of 40 miles of roadways within Tift County.  This work will be awarded in one (1) contract with a 180 consecutive calendar day construction schedule.

Bid Due Date: June 19, 2019

Bid Results

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the project titled Chestnut Avenue Street and Drainage Improvements.  In general, construction consists of installation of storm drain pipe, sewer replacement, 155 tons of asphalt paving, striping of approximately 0.3 miles of roadway, and all erosion control measures.  This work will be awarded in one (1) contract with a construction timeline of 120 consecutive calendar days

Bid Date:  April 24, 2019

Bid Results 

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY 2019 LMIG for Roadway Resurfacing as described in the Contract Documents and Specifications.  In general, construction consists of resurfacing and striping of approximately 7.5 miles of roadway and all associated measures for the complete project.  This work will be awarded in one (1) contract with a 120-consecutive calendar day construction schedule.