Project Name: FY23 LMIG for Roadway Resurfacing
Project Number: W2009-050-01
Bid Date: Wednesday, May 15, 2024, at 11:00AM
Work to be Done:
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed FY23 LMIG for Roadway Resurfacing as shown on the construction drawings. In general, construction consists of the base repair and resurfacing of +/- 5.66 linear miles of city streets and all associated measures for the complete project. This work will be awarded in one (1) contract with a 90 consecutive calendar day construction schedule.
Engineer’s Estimate: $ 2 Million
- Advertisement for Bids
- Plan Holder’s List
- Addendum No. 1
- Bid Results (Pending)